Konya-Karaman, Konya-Aksaray, Konya-Afyon, Konya-Ereğli Employer : General Directorate of Highways Starting Date :05.09.2011 Status : Completed
Milas Soke Road
Milas Soke Road KM 40 +000 (10+000) -80+880 (50+880) Arası Toprak Tesviye, Üstyapı Tünel ve Sanat Yapıları Yapım İşi Employer : 2 Regional Directorate of Highways IZMIR Starting Date :20.11.2009 Status : Completed
Lüleburgaz Büyükatıran Tekirdag
Hot Bituminous Mixture Work at Lüleburgaz-Büyükkarşıran-Tekirdağ Provincial Border Employer : 1st Regional Directorate of Highways ISTANBUL Starting Date :22.05.2009 Status : Completed
Kazan Kizilcihamam Gerede Road
Kazan Kizilcihamam Gerede Road Between 67+685-103+500 (Various Sections) BSK Construction Work Employer : 4th Regional Directorate of Highways Starting Date :20.11.2009 Status : Completed
Adiyaman Yesilyurt Malatya Road
Adiyaman Yesilyurt Malatya Road Employer : General Directorate of Highways ANKARA Starting Date :18.05.2009 Status : Completed
Gökçeköy Regulator and HEPP Construction
Gökçeköy Regulator and HEPP Construction Power Plant Installed Power 6.Mwm Plant Location : Kemaliye ERZİNCAN Plant Type :Hydroelectric Power Plant Yıllık Üretim :32.000.000 Kwh Status : Completed
Oaks Basalt Crushing and Screening Plant
Oaks Basalt Crushing and Screening Plant Capacity : 250 ton/hour Position :Çamlıdere/ANKARA Starting Date :16.06.2011 Status : Completed
Bilecik Eskişehir Junction Söğüt and Bozüyük Eskişehir Road
Bilecik Eskişehir Junction Söğüt and Bozüyük Eskişehir Road Employer : General Directorate of Highways Starting Date :19.06.2003 Status : Completed
Kavacık Beykoz Road Supply Construction
Kavacık Beykoz Road Supply Construction Employer : Highways 17th Regional Directorate İSTANBUL Starting Date :31.07.2008 Status : Completed
Yalova Topcular Altinova Road
Yalova Topcular Altinova Road Employer : General Directorate of Highways Starting Date :03.02.1998 Status : Completed
Gölbaşı Doğanşehir Junction Kapidere Road
Gölbaşı Doğanşehir Junction Kapidere Road Employer : General Directorate of Highways ANKARA Starting Date :04.10.1997 Status : Completed
Elazig Malatya State Highway
Elazig Malatya State Highway (From Farm to Malatya) Employer : 8th Regional Directorate of Highways ELAZIG Starting Date :10.08.1996 Status : Completed
Terra 1 Project
Terra 1 Project Reconstruction of Roads in Yalova, Subaşı, Taşköprü, Katazdere, Teşvikiye and Çınarcık Employer :Yalova Municipality Starting Date :22.05.2006 Status : Completed
Bala Ayr. Kulu Ay. (Part 1) Year Construction
Bala Ayr. Kulu Ay. (Part 1) Year Construction Employer :General Directorate of Highways Starting Date :18.05.2009 Status : Completed
Sinop Boyabat (Garandu Variant)
Sinop Boyabat (Garandu Variant) Employer :General Directorate of Highways Starting Date :27.09.1989 Status : Completed
Bartin Bosphorus Inkum Road
Bartin Bosphorus Inkum Road Employer :General Directorate of Highways Starting Date :29.07.1993 Status : Completed
Tuna Cad. Asphalt Construction
Tuna Cad. G.O.P. 4.Sok. and Spor Cad. Making Asphalt Coating Employer :Yalova Municipality Starting Date :04.11.2003 Status : Completed
Yalova Çınaraltı Artificial Buildings and Soil Structure Study
Yalova Çınaraltı Artificial Buildings and Soil Structure Study Employer :Yalova Special Provincial Administration Starting Date :13.07.2004 Status : Completed
Antalya Burdur Apart. Korkuteli Road
Antalya Burdur Apart. Korkuteli Road Employer :General Directorate of Highways Starting Date :01.10.1991 Status : Completed
Fatih Cad. and Karadeniz Cad. Asphalt Paving Construction
Fatih Cad. and Karadeniz Cad. Asphalt Paving Construction Employer :General Directorate of Highways Starting Date :06.07.2002 Status : Completed
Malatya Kayseri Ayr. Road Construction Between the Sılatı
Malatya Kayseri Ayr. Road Construction Work between the Süsatı and Bollards Employer :8th Regional Directorate of Highways ELAZIG Starting Date :05.12.2003 Status : Completed
Yeniköy Değirmendere Karamürsel Halıdere and Eregli Roads
Reconstruction of Roads in Yeniköy Değirmendere Karamürsel Halıdere and Eregli Employer :Kocaeli Metropolitan Municipality Starting Date :01.06.2006 Status : Completed
Bituminous Hot Mix Asphalt Concrete Work
Bituminous Hot Mix Asphalt Concrete (Binder and Wear Layer) Work Employer :Yalova Municipality Starting Date :19.07.2007 Status : Completed
Kepetaş Elazig Center Artificial Lake
Kepetaş Elazig Center Artificial Lake Work Employer :9th Regional Directorate of Highways Starting Date :08.09.1993 Status : Completed
1.District Border (Duzce Inner City Crossings) Road
1.District Border (Duzce Inner City Crossings) Road Employer :4th Regional Directorate of Highways Starting Date :8.01.1987 Status : 18.07.1989
Konya-Doğanhisar-Çetme Pond
Konya-Doğanhisar-Çetme Pond Employer :Rural Services 2nd Regional Directorate Starting Date :17.04.1990 Status : 11.09.1991
Bartın Junction - Ulus Road
Bartın Junction - Ulus Road Employer :15th Regional Directorate of Highways Starting Date :2.08.1993 Status : 10.09.1996
Cut.Asphalt Bet.Coating Between Altınova-Taşköprü of Karamürsel-Yalova Road.
Cut.Asphalt Bet.Coating Between Altınova-Taşköprü of Karamürsel-Yalova Road. Employer :1st Regional Directorate of Highways Starting Date :27.05.1999 Status : 16.08.1999
Antalya-Burdur Separate. Korkuteli Road
Antalya-Burdur Separate. Korkuteli Road Employer :General Directorate of Highways Starting Date :27.05.1991 Status : 01.11.1999
Kocaeli, Gölcük1-4 Değirmendere 3, Değirmendere 4, Eregli 1 Veulaşlı 2-3 Pref. con. Area. Employer :1st Regional Directorate of Highways Starting Date :25.11.1999 Status : 24.12.1999
Kocaeli Bahçecik-Döngel Town Vineyard. Path.
Permanent Place of Bahçecik-Döngel District in Kocaeli Province. Area. Bond. Path. Construction Work Employer :General Directorate of Highways Starting Date :17.06.1999 Status : 17.06.2000
Kemk'lığı D.Door-Alarm Housing Facilities Main Road Asphalt Repair
Kemk'lığı D.Door-Alarm Housing Facilities Main Road Asphalt Repair Employer :Altinova Maintenance, Repair and Engineering Command Starting Date :20.09.2000 Status : 09.10.2000
Asphalt Repair in Kemklığı 836-860 and 842-860 Lodging Area
Asphalt Repair in Kemklığı 836-860 and 842-860 Lodging Area Employer :Altinova Maintenance, Repair and Engineering Command Starting Date :10.08.2001 Status : 24.08.2001
Kemklığı 811-836 Housing Area Asphalt Repair
Kemklığı 811-836 Housing Area Asphalt Repair Employer :Altinova Maintenance, Repair and Engineering Command Starting Date :10.08.2001 Status : 24.08.2001
Altinova Maintenance, Repair and Engineering Command
Altinova Maintenance, Repair and Engineering Command Employer :Altinova Maintenance, Repair and Engineering Command Starting Date :10.08.2001 Status : 24.08.2001
Kemk'lığı No. 835 and 849 Lodging Area Asphalt Repair
Kemk'lığı No. 835 and 849 Lodging Area Asphalt Repair Employer :Altinova Maintenance, Repair and Engineering Command Starting Date :10.08.2001 Status : 24.08.2001
Besni-Araban 5.Bl.Hd. Road and (Besni-Araban) Separate. Basic Material. Asf. Gravel Supply and Warehouse Transport
Besni-Araban 5.Bl.Hd. Road and (Besni-Araban) Separate. Basic Material. Asf. Gravel Supply and Warehouse Transport Employer :8th Regional Directorate of Highways Starting Date :30.09.2000 Status : 30.09.2001
Elazig - Malatya Road And (Elazig - Malatya) Separated Kussaray Road Basic Materials Asf. Mıcır Tem. Employer :8th Regional Directorate of Highways Starting Date :12.12.2001 Status : 30.09.2002
Fatih Cad. and Karadeniz Cad. Making Hot Asphalt Paving
Fatih Cad. and Karadeniz Cad. Making Hot Asphalt Paving Employer :Yalova Mayor's Office Starting Date :7.06.2002 Status : 30.10.2002
Umraniye Branch Manager Drinking Water within the Liability Area
Umraniye Branch Manager Drinking Water within the Liability Area Employer :General Directorate of İski Starting Date :05.09.2001 Status : 31.05.2003
Tuna Cad. G.O.P. 4.Sok. and Spor Cad. Making Asphalt Coating
Tuna Cad. G.O.P. 4.Sok. and Spor Cad. Making Asphalt Coating Employer :Yalova Mayor's Office Starting Date :18.07.2003 Status : 04.11.2003
Hot Asphalt Covering of Industry and Wholesalers Site Roads
Hot Asphalt Covering of Industry and Wholesalers Site Roads Employer :Yalova Mayor's Office Starting Date :03.09.2004 Status : 18.10.2004
Yalova-Thermal Çınarlı Road Engineering Structures and Superstructure Works Construction Work
Yalova-Thermal Çınarlı Road Engineering Structures and Superstructure Works Construction Work Employer :Yalova Special Provincial Administration General Secret. Starting Date :13.07.2004 Status : 24.10.2004
Elazig Central Kepektaş Pond and Irrigation Construction
Elazig Central Kepektaş Pond and Irrigation Construction Employer :DSI IX. Regional Directorate Starting Date :08.09.1993 Status : 01.07.2004
Malatya - Kayseri Section-5.Hd.Highway (Crime-Slide) Work
Malatya - Kayseri Section-5.Hd.Highway (Crime-Slide) Work Employer :8th Regional Directorate of Highways Starting Date :5.12.2003 Status : 10.08.2005
Terra 1 Project in Yalova-Yuvacık-Uzunçiftlik-Bekirpaşa and Körfez, Renew Road.
Terra 1 Project in Yalova-Yuvacık-Uzunçiftlik-Bekirpaşa and Körfez, Renew Road. Employer :Yalova Mayor's Office Starting Date :05.05.2005 Status : 07.11.2005
Gölcük-Altınova Divided Road Construction (Kırmataş Sub-base and Plant-Miks Foundation Construction) Work
Gölcük-Altınova Divided Road Construction (Kırmataş Sub-base and Plant-Miks Foundation Construction) Work Employer :1st Regional Directorate of Highways Starting Date :28.04.2005 Status : 07.12.2005
Karamursel Asphalt Road Covering
Karamursel Asphalt Road Covering Employer :Karamursel Municipality Starting Date :31.07.2006 Status : 16.10.2006
Karamürsel Sahil-Permanent Houses (İznik Road) Straight on the Connection Road. Heat
Karamürsel Sahil-Permanent Houses (İznik Road) Straight on the Connection Road. Heat Employer :Kocaeli Metropolitan Municipality Starting Date :16.06.2006 Status : 21.11.2006
Yalova Province Earthquake Zone Soğucak and Subaşı Connection Roads Supply Work
Yalova Province Earthquake Zone Soğucak and Subaşı Connection Roads Supply Work Employer :1st Regional Directorate of Highways Starting Date :06.10.2008 Status : 22.12.2008
Karamursel Asphalt Road Construction Work
Karamursel Asphalt Road Construction Work Employer :Karamursel Municipality Starting Date :19.11.2008 Status : 24.12.2008
Bituminous Hot Mix Coating with Saray Asphalt Plant
Bituminous Hot Mix Coating with Saray Asphalt Plant Employer :1st Regional Directorate of Highways Starting Date :14.05.2009 Status : 25.12.2009
Port Road Construction Retaining Walls Auto Guardrail
Port Road Construction Retaining Walls Auto Guardrail Employer :Town Port Operations Starting Date :16.04.2008 Status : 04.02.2010
Abrasion Asphalt Road Construction Construction
Abrasion Asphalt Road Construction Construction Employer :Buyukkaristiran Municipality Starting Date :14.07.2011 Status : 15.09.2011
Bsk Coating on the Lüleburgaz-Büyükkarşıran-Tekirdağ Provincial Border Road
Bsk Coating on the Lüleburgaz-Büyükkarşıran-Tekirdağ Provincial Border Road Employer :1st Regional Directorate of Highways Starting Date :14.05.2009 Status : 31.10.2011
Şadiye Bridge Renovation Works on Konya-Afyonkarahisar State Highway
Şadiye Bridge Renovation Works on Konya-Afyonkarahisar State Highway Employer :3rd Regional Directorate of Highways Starting Date :03.09.2012 Status : 05.11.2013
Yeşilvadi 2nd Stage B Region Recreation Area Landscaping Construction Work
Yeşilvadi 2nd Stage B Region Recreation Area Landscaping Construction Work Employer :Şahinbey Municipality Presidency Starting Date :21.03.2013 Status : 28.03.2014
Woodworking Industry High-Speed Train Bridge Interchange Construction
Woodworking Industry High-Speed Train Bridge Interchange Construction Employer :Konya Metropolitan Municipality Starting Date :28.08.2013 Status : 25.09.2014
Boundaries of the 41st (bolu) and 42nd (Kızılcahamam) Branch Chiefs of Karayolları Included. Muh. Path. Make Bsk. Heat
Boundaries of the 41st (bolu) and 42nd (Kızılcahamam) Branch Chiefs of Karayolları Included. Muh. Path. Make Bsk. Heat Employer :4th Regional Directorate of Highways Starting Date :08.05.2014 Status : 15.10.2015
Ardahan -Kars Ayr. Çıldır - Aktaş Road Work
Ardahan -Kars Ayr. Çıldır - Aktaş Road Work Employer :18th Regional Directorate of Highways Starting Date :22.02.2012 Status : 06.12.2016
Campus Infrastructure and Landscaping Construction Work
Campus Infrastructure and Landscaping Construction Work Employer :Selcuk University Rectorate Starting Date :30.04.2014 Status : 20.12.2016
Beykoz, Riva Creek Bridge Construction
Beykoz, Riva Creek Bridge Construction Employer :The Istanbul Metropolitan Municipality Starting Date :29.06.2015 Status : 11.05.2017
Bituminous Hot Mixture on the Ipsala Border Gate-Malkara Road
Bituminous Hot Mixture on the Ipsala Border Gate-Malkara Road Employer :1st Regional Directorate of Highways Starting Date :15.11.2011 Status : 28.07.2017
Uşak Merkez Kocadere Pond
Uşak Merkez Kocadere Pond Employer :D.S.I. 23. Branch Office Starting Date :29.04.2014 Status : 28.11.2017
Arrangement of Konya Metropolitan Municipality Streets
Arrangement of Konya Metropolitan Municipality Streets Employer :Konya Metropolitan Municipality Starting Date :24.05.2012 Status : 24.04.2017
Uşak Merkez Illez Pond
Uşak Merkez Illez Pond Employer :D.S.I. 23. Branch Office Starting Date :............ Status : .............